Charging & grid
Bidirectional charging: what it pays in Switzerland

The idea of using the car as storage for the power grid is old. The Swiss legal basis is new. Since 1 January 2026 the grid operator refunds the grid usage fee for electricity you charged from the grid and later fed back. What that is worth can be calculated. It comes to 13,04 centimes per kilowatt-hour. For 100 francs to add up, 767 kilowatt-hours have to go back into the grid.
Three points are in the law
Bidirectional charging means the car does not only take electricity but also gives it back, into the building or into the grid. Without a rule of its own the grid usage fee would fall due twice: once on charging, once on whoever later draws the electricity fed back. The Electricity Supply Act removes that for storage facilities with end consumption.
- The refund. On request the grid operator refunds the grid usage fee for the quantity of electricity that is fed back after being drawn from the grid and stored, at most at the tariff applying at the time it was drawn. Article 14a paragraph 4 letter a StromVG, in force since 1 January 2026.
- The amount comes from the grid operator. It sets a refund tariff and deducts the amount from the grid usage fee on the next invoice. Articles 18d and 18e StromVV, in force since 1 January 2026.
- No second meter. The measurements for this proof may be taken with meters already present at the storage facility, in the charging station or in the vehicle. Article 14a paragraph 4bis StromVG, in force since 1 April 2026.
The third point goes back to a motion by Jürg Grossen of 20 December 2023, tabled in the National Council on the acceleration act (business 23.051). His reasoning names the ground. If an additional smart meter had to be installed at the operator’s cost for every one of these small storage units, that would be «economically and ecologically disproportionate» and would stifle vehicle-to-grid at birth. Grossen is president of Swiss eMobility; the association states that on its own site.
What manufacturers and grid operators get wrong
The Federal Office of Energy described a case in December 2025. A homeowner wanted to charge bidirectionally and was told by manufacturers, by wallbox suppliers and by his distribution grid operator that this was not yet permitted by law. The office calls that information wrong: «There are no legal restrictions that would prohibit the use of bidirectional charging.» A vehicle that gives electricity back counts in law as a storage facility with end consumption. Olivier Stössel, head of grids and security at the Association of Swiss Electricity Companies, explains the wrong answers with the transition phase the industry is in; there are still few bidirectional vehicles in use.
Feeding electricity back into your own house was never prohibited. The distribution grid operators described in their own industry documents in 2016 how it is to be done. What the operator does require is registration: every device above 3,6 kW must be reported to it and installed by an electrician. That applies to a bidirectional charging station as it does to any other wallbox.
What the refund is worth
The ordinance says what the refund tariff consists of: the average energy component of the grid usage tariff for the tariff year at the place of feed-in, plus the costs for ancillary services, the electricity reserve, the grid surcharge and the measures under Articles 15a and 15b StromVG. In the federal official series for 2026 that is 10,73 centimes of grid usage and 2,30 centimes of grid surcharge, 13,04 centimes/kWh together. The municipality in the middle comes to 13,23. The two are 0,20 centimes apart.
For that to become 100 francs, 767 kilowatt-hours have to go back into the grid. That is 17,0 per cent of what a household in the lead profile H4 draws in a whole year, namely 4’500 kWh. The figure is an order of magnitude. Every grid operator sets its own refund tariff, and what they set nobody collects publicly.
Nobody has to take your electricity
The refund of the grid usage fee is laid down in law. For the electricity itself that is not the case. The Federal Office of Energy writes that there is «no general obligation on the part of grid operators to accept and remunerate» electricity from the battery; anyone wanting to feed into the grid via V2G has to find a buyer for it. If the operator has a grid constraint, it can buy the energy for relief. A claim to that is written nowhere.
For solar electricity the rule is different. Article 15 paragraph 1 of the Energy Act obliges the grid operator to accept and remunerate the electricity offered to it; paragraph 2 limits this to installations up to 3 MW of capacity or 5’000 MWh of annual production. The article speaks of producers and of installations, and where the offered electricity comes from is not stated; the Federal Office of Energy reads it as not covering electricity from a vehicle battery. We give both readings and provide no legal advice. For a household’s calculation that means: the 13,04 centimes/kWh are secure, everything above that depends on whether a buyer pays.
What the largest Swiss field trial measured
From autumn 2022 to spring 2024 Mobility put fifty bidirectional Honda e into its regular car-sharing operation. The project was called «V2X Suisse» and is the largest trial of its kind in Switzerland so far. More than 6’600 people drove the cars, around 800’000 kilometres. Complaints that could be traced to the technology were almost non-existent.
Before the start the assumption was that a connected vehicle would bring one to two francs of flexibility revenue a day. At the end Mobility states: depending on market prices up to 2’000 francs per year and vehicle would have been possible — but the investment and operating costs were too high and were not covered in the test phase. Mobility has discontinued the bidirectional technology for the time being.
Up to 2’000 francs a year per vehicle would have been possible. The costs were still not covered.
Four conditions Mobility names
The trial ends with a list. What is missing for the technology to carry:
- The bidirectional charging stations have to get cheaper.
- More bidirectional vehicles are needed, and at lower prices — the market has developed more slowly than hoped.
- The distribution grid operators have to make feeding back more attractive.
- An interoperable standard is missing, so that different makes can charge and discharge at the same station. Mobility expects it by 2027.
Why the German calculation does not work here
In Germany the calculation runs on the price difference over the day. Solar electricity is almost free during the day and expensive after sunset. Former VW chief Herbert Diess sets this out in an interview with the Frankfurter Rundschau and names a bidirectional wallbox at around 2’000 euros that, according to calculations by The Mobility House, pays for itself in about a year. The German automotive industry association puts the same wallbox at more like 4’000 euros. Diess is chairman of the board of The Mobility House; the report we take this from says so itself.
A Swiss household in basic supply lacks the price difference this calculation rests on. Article 6 paragraph 3 of the Electricity Supply Act says: «Electricity tariffs are fixed for at least one year.» And anyone drawing less than 100 megawatt-hours a year may not switch supplier anyway; that is every household. What reliably comes back in Switzerland is the grid usage fee. The hourly price that carries the German calculation does not come on top.
In Germany the regulation has moved in the meantime. On 1 October 2026 the Bundesnetzagentur issued its ruling on the market integration of storage facilities and charging points. It describes the state before that as follows: «Bidirectional charging points that can be used both for charging electric vehicles and – like an electricity storage facility – for feeding electricity back from the cars were previously excluded.» They are now put on a par with storage facilities, through two billing routes. A transition period runs until 30 September 2027, during which grid and metering point operators have to consent before one of the two routes can already be used.
Manufacturers are gearing up for it. On 9 February 2026 BMW and E.ON opened Germany’s first commercial V2G offer, for the BMW iX3 with the bidirectional BMW Wallbox Professional and an intelligent metering system. What is paid for is not the kilowatt-hour but the time on the cable: 24 cents for every hour the car is connected with V2G active, at most 60 euros a month and 720 euros a year. The first 100 customers get 700 euros off the wallbox. The electricity tariff that goes with it has a fixed energy price and a fixed base price, so no hourly price there either. The offer applies in Germany only.
Whether your car can do it at all
Feeding back requires the vehicle to be able to do it, over direct current with a charging station built for it, or over alternating current under ISO 15118-20. We know of no Swiss source that states this per model, and the model radar carries no field for it. We therefore give no figure. Anyone counting on this capability should have it confirmed in writing before the purchase, with the standard quoted.
Technically the sticking point is compatibility. Luca Castiglioni, head of the mobility research unit at the Federal Office of Energy, calls the missing compatibility between vehicles and charging stations the greatest challenge. Charging bidirectionally across manufacturers currently works only for Japanese models with a CHAdeMO connector. With CCS, the European connector, every manufacturer has its own solution; the VW ID models work only with a few stations approved by VW. The communication standard ISO 15118-20, on which the alternating-current path builds, is not binding. Castiglioni expects a direct-current solution from 2028 at the earliest, the alternating-current path later.
With your own sun the arithmetic changes
Anyone with a solar installation charges the battery at midday with their own electricity and brings it back into the house in the evening. The refund falls away in that case: Article 14a paragraph 4 letter a StromVG refunds the grid usage fee for electricity that is stored and fed back after being drawn from the grid. Electricity from your own roof was never drawn. It still pays, only differently: what you consume yourself you do not have to buy.
| Route | centimes/kWh excl. VAT | where the figure comes from |
|---|---|---|
| Feed solar electricity in | 6,00 | minimum remuneration for installations below 30 kW, Article 12 paragraph 1bis letter a EnV |
| Consume solar electricity yourself via the battery | 27,70 | supply avoided, from the federal official tariff series, profile H4 |
| Charge grid electricity and feed it back | 13,04 | refund of the grid usage fee, calculated |
The gap between the first two rows is 21,70 centimes/kWh, and that is the real arithmetic of bidirectional charging. It lies 8,66 centimes above the refund. All three rows are stated without value added tax, and that is not an oversight: ElCom publishes its tariffs that way, Article 12 EnV names a net amount, and so does the grid-usage refund. On the electricity bill the second row gains {MWST} per cent; the other two do not. What the table leaves out are the storage losses. For the route into the car there is now a measurement: the ADAC measured five vehicles and loses a median 6,9 per cent at an 11 kW wallbox, 14,2 at the household socket. For the return path, from the battery into the house, we know of no figure, and therefore no round-trip efficiency is given here.
And what about the electricity itself? Alongside the refund of the grid usage fee stands the question whether the electricity fed back is paid for. For electricity that came from the grid the answer is no: the obligation to accept and remunerate under Article 15 EnG applies to electricity from generating installations, and a battery charged from the grid is not one. In that case the 13,04 centimes/kWh are all there is. The exception hangs on the metering: if it can be proven unambiguously that the stored and re-fed electricity comes from a generating installation within the meaning of Article 15 paragraph 1 EnG — from your own roof, that is — the remuneration applies. Then the «solar electricity fed in» row of the table applies, not the third.
Where it is measured, and who needs a meter
For a car the meter sits at the house connection, not in the charging station: Article 18g paragraph 3 StromVV declares the «quantity of electricity fed in by the mobile storage facility at the house connection point» to be the relevant one. Anyone who consumes the electricity in their own house instead of giving it to the grid feeds nothing in there — so there is no refund for that route either. And for a vehicle the ordinance says no more than that. To a stationary storage facility, paragraph 1 gives a rule of calculation: compare grid draw and storage every quarter hour, take the smaller value. For the mobile one it is missing. Anyone charging from both — sun at midday, grid at night — will not find in the ordinance how the two shares are separated.
The ordinance requires an intelligent metering system in two cases, and only the first concerns a household: where the storage facility is connected to a generating installation that is operated for self-consumption and is subject to the licensing requirement under Article 6 NIV (Article 18f paragraph 1 letter a StromVV); the second covers pilot and demonstration installations. The metering costs are borne by whoever operates the installation (paragraph 2). That is the fixed installation connected by a licensed contractor. A plug-in balcony installation is plugged in and not permanently connected, so it does not fall under it. Where the line runs once a storage unit, more power or a vehicle connection are added is in no provision.
Charge cheap, give back dear?
The question comes up immediately, and the answer is in the ordinance. Article 18d paragraph 4 StromVV caps the refund at the «energy component invoiced» plus the cost items named — more than was paid never comes back. And Article 18e paragraph 2 calculates the refund tariff on a non-dynamic tariff even where a dynamic one applies to the storage facility. Charging when the grid fee is low and feeding back when it is high gains nothing on the grid fee. Zero is what the energy price becomes, never the grid fee: that falls due whatever the electricity costs.
On attribution the law says more than it first appears. Charging at work and discharging at home is permitted: Article 14a paragraph 4 letter a StromVG does not require draw and feed-back to happen at the same grid connection. What counts under Article 18g paragraph 3 StromVV is the quantity the mobile storage feeds in at the house connection point — so the refund runs through the fixed connection point. In practice the case cannot be settled today: tracking every charge and discharge would require a central data exchange system between grid operators, and no such data hub exists in Switzerland. Where the vehicle keeper and the connection holder are different people, as with a company car, this lies behind the grid connection point: Article 14a ties the refund to the operator of the storage, and that is whoever operates the battery as storage. Who claims the entitlement must be established towards the grid operator; the relationship with employer, lessor or charge point operator is not governed by electricity supply law. What remains open is carried in the register of gaps as lg33.
What the station costs, and what the cantons pay
The biggest item in bidirectional charging is the charging station, and for Switzerland there are now prices for it. A bidirectional direct-current station costs CHF 13’990 to 16’502 including installation — two offers from Swiss suppliers, one of them without value added tax stated. An ordinary wallbox is at CHF 1’700 in the median, out of 91 prices. That is 8,2 to 9,7 times as much, and the extra cost comes to CHF 12’290 to 14’802.
| Canton | Contribution | what goes with it |
|---|---|---|
| Ticino | CHF 4’000 | the highest contribution; the canton also supports ordinary stations, with CHF 500 |
| Bern | CHF 3’000 | at most 35 per cent of the installation costs, application always before building starts |
| Zurich | CHF 2’000 | on 28 September 2026 more than 96 per cent of the funds were claimed, the graphic on the same page says 98; ends at the latest at the end of 2026 |
| Graubünden | CHF 2’000 | at most CHF 50’000, together with other public contributions at most half the costs |
| Lucerne | CHF 2’000 | application after building starts, no new buildings |
| Uri | CHF 2’000 | since 2026, budget for this measure CHF 50’000 |
What is supported is the station and not its use. The same direct-current station is needed for the house as for the grid, and all six programmes require it expressly — an ordinary wallbox cannot feed back. Entitled to apply is whoever owns the parking spaces or the property; tenants need the owners. And the procedures contradict each other: Zurich allows the installation first for one parking space and the application up to six months later, Bern accepts an application submitted later in no case, Lucerne expressly requires it after building starts.
Two cantons are missing from the table on purpose. Thurgau discontinued its support as of 1 July 2026, and for Schaffhausen the check is still open because the cantonal site does not accept our requests. What a contribution achieves is shown by the table further up: Ticino’s CHF 4’000 cover 33 per cent of the extra cost, CHF 2’000 cover 16. After that, at 21,70 centimes/kWh, another 38’210 kilowatt-hours have to pass through the battery before the station is paid for, and that is 8,5 times the annual supply in reference profile H4. The storage losses are not deducted from it.
What this means for a purchase
- The refund is an entitlement, not an offer. It runs on request to the grid operator and appears as a deduction on the next invoice. 13,04 centimes/kWh is the order of magnitude, the exact tariff comes from your utility.
- For the electricity itself there is no obligation to accept it. The grid usage fee comes back, the remuneration of the energy stands in no law. Anyone planning V2G clarifies with their grid operator beforehand whether it buys, and at what price.
- Compatibility comes before the connector. Charging bidirectionally across manufacturers works today only via CHAdeMO. With CCS each manufacturer approves the stations that work with its cars; a direct-current solution via ISO 15118-20 is expected by the Federal Office of Energy from 2028 at the earliest.
- The implementing provisions on metering are missing. The law permits existing meters, the requirements for them are for the Federal Council to set. The ordinance in its version of 1 July 2026 does not contain them.
- The big item is the charging station. In Switzerland it costs CHF 13’990 to 16’502 including installation, read off two suppliers. The 2’000 to 4’000 euros from the German debate lie far below that, and they are two statements by two interested parties. Six cantons pay CHF 2’000 to 4’000 towards the station.
- Anyone justifying the purchase with this return is calculating with figures nobody publishes for Switzerland. As an addition to a car you want anyway, the matter is small in the arithmetic and, for the grid usage fee, secure in law.
Sources: Electricity Supply Act (SR 734.7) in its version of 13 August 2026 and Electricity Supply Ordinance (SR 734.71) in its version of 1 July 2026, both on Fedlex. In addition the Energy Ordinance (SR 730.01) in its version of 1 July 2026 for the minimum remuneration and the Low Voltage Installations Ordinance (SR 734.27) in its version of 31 October 2025 for the licensing requirement under Article 6 and the Energy Act (SR 730.0) in its version of 1 April 2026 for the obligation to accept and remunerate under Article 15. Motion Grossen Jürg of 20.12.2023 on business 23.051 in the papers of the Federal Assembly. Field trial: Mobility on «V2X Suisse», 19.06.2024. German debate: elektroauto-news.net, 11.09.2026, after an interview in the Frankfurter Rundschau. Legal position, interoperability and the wrong answers: Federal Office of Energy, energeiaplus, 04.12.2025, with Luca Castiglioni (SFOE) and Olivier Stössel (VSE). Germany: Bundesnetzagentur, MiSpeL ruling of 01.10.2026, and the release by BMW and E.ON of 09.02.2026. Subsidies and station prices: all 26 cantons read off the official support document, two Swiss dealer prices, as of 04.10.2026 — openly in ladefoerderung.json ↗. Tariff figures: ElCom tariff data 2026 via LINDAS.
Transparency: the 13,04 centimes/kWh are calculated from the components of the household tariff (grid usage plus grid surcharge of the federal official series for 2026), not from reported refund tariffs. Those do not exist as a series. What the ordinance describes as the refund tariff is the energy component at the place of feed-in; our figure is the corresponding item of a household tariff. Levies to canton and municipality and the metering costs are not included, because the ordinance does not name them. Medians are moreover not additive: the sum of two medians is not the median of the sum. The figures are recalculated from gemeindetarife.json ↗ at every build and searched for in the text, in all four languages; the register of gaps carries the open point as lg32.