wattradar. ← Home

Guide · Charging at home

Wallbox compass Switzerland: 11 or 22 kW, mobile or fixed

Between the socket in the garage and a hard-wired charging station there are not two options but five. They differ in power, in the connection, and in whether the unit stays on the wall. What they share: every one of them has to be registered.

The recommendation names a type, a power and a price range, not a brand. No ranking and no dealer. Every device figure comes from the manufacturer itself, every price carries the date it was read.

The compass: tick what you need

You can tick several. What appears are the models that state at the manufacturer every ticked point — and separately those where we have not yet read a property. They are not ruled out, we simply do not know.

Which power?

The compass needs JavaScript. The table below shows the same matching by hand.

The requirement first, the unit second

One unit is not better than another, it does something else. So the choice starts with what you need — and the four points below are where units genuinely differ. Power and type are in the tables above.

NeedThe problemThe solution
Taking it along
You do not only charge at home — at friends’, on holiday, or you are moving.
A fixed station stays on the wall, and the connection at the destination is not the one at home. A household socket is no substitute: it gives about 2.3 kW.A mobile unit with the matching plug attachment. CEE16 gives 11 kW, CEE32 gives 22 — settle the connection at the destination beforehand. more on this ↓
JUICE BOOSTER 3 air, go-e Charger Gemini flex, JUICE BOOSTER 2, NRGkick 32A
Load management
Several loads on the same building connection, or a second car.
A current set by hand is rigid. With washing machine, heat pump and car running together the fuse goes — or you throttle permanently and always charge slowly.Dynamic load management: the unit measures the building’s consumption and releases what is left. That needs a meter at the building connection, not just an app. more on this ↓
JUICE BOOSTER 3 air, go-e Charger PRO, JUICE CHARGER me 3 unlimited, Zaptec Go, Zaptec Pro MID
expressly without: JUICE BOOSTER 2, Heidelberg Energy Control Plus, Heidelberg Home Eco
Charging on solar power
You have your own array and want the surplus in the car.
Below the minimum charging current nothing runs at all, and three-phase that is about 4.1 kW of surplus. «PV-ready» on the box says nothing about it.A unit that starts low enough and an automatic switch between one and three phases — then a small surplus is enough. Coordinate with the energy manager. more on this ↓
Spelsberg Wallbox, ABL Pulsar Pro, go-e Charger PRO
expressly without: JUICE BOOSTER 2, Heidelberg Energy Control Plus, Heidelberg Home Eco
Billing
An employer or fellow tenants help pay for the electricity.
A meter in the unit is not yet billing, and in Switzerland nobody has to prove the measuring stability of meters at public charging stations.A version with an MID meter, plus user assignment and a body that bills. Order the three separately rather than assuming «billable». more on this ↓
Spelsberg Wallbox, ABL Pulsar Pro, Easee Charge Max, Easee Charge Pro, go-e Charger PRO, Zaptec Pro MID
expressly without: JUICE BOOSTER 2, Heidelberg Energy Control Plus, Heidelberg Home Eco, Zaptec Go
Restricting access
The parking space is open to others.
Whoever plugs in charges on your bill. A wallbox without release is open to anyone standing next to it.RFID cards or a local lock. First count how many people need access, and what extra cards cost. more on this ↓
ABL Pulsar Max, go-e Charger PRO, Zaptec Go
expressly without: Heidelberg Energy Control Plus, Heidelberg Home Eco

The last column names only models where the manufacturer states the property itself. Nothing there does not mean no, it means we have not found it at the manufacturer — and what we have not found we do not fill in by feel.

Five types, from mobile to fixed

The power depends on the connection, not on the unit. A mobile 22 kW station on a CEE16 socket charges at 11 — in the words of the TCS guide: «Das schwächste Glied in der Ladekette (Auto, Ladekabel und Wallbox) entscheidet über die maximale Ladeleistung.»

Power in kilowatts when charging three-phase. The household socket is not a charging point and appears here as a reference.
TypeConnectionPowerUnit
Household socketT13, single-phase2,3 kWyou take it along
mobile on CEE16CEE16, five-pole11 kWyou take it along
mobile on CEE32CEE32, five-pole22 kWyou take it along
fixed station, 11 kWhard-wired or CEE1611 kWstays on the wall
fixed station, 22 kWhard-wired or CEE3222 kWstays on the wall

The 2.3 kW of the household socket is not an estimate: «Im privaten Bereich sind normale Haushaltsteckdosen meist mit 13 Ampere vorgesichert. Der Nennstrom der Steckdose beträgt aber meist nur 10 Ampere (2.3 kVA Leistung).» That both types are permitted is in the TCS guide: «Grundsätzlich kann die Wallbox fest mit dem Wechselstromnetz verbunden sein oder trennbar mithilfe eines CEE-Steckers.»

Who offers which type

20 models from 9 manufacturers, read on 01.11.2026 on their own sites. The list is not exhaustive and is not a ranking: it runs from mobile to fixed.

The wording below the model name is the manufacturer’s own, quoted in German. Each row carries the read date in the manufacturer column.
ModelManufacturerTypePowerDevice CHF
JUICE BOOSTER 3 air
11 kW – mobil, smart, mit Lastmanagement
Juice Technology
Schweiz · 31.10.2026
Sitz Schweiz.
mobile on CEE1611 kW1’149–1’649.95
5 ×
go-e Charger Gemini flex
6 A bis 16 A / 32 A; Ladeleistung bei Lieferung auf 11 kW begrenzt, kann vom Installateur auf 22 kW erhöht werden
go-e
Österreich · 01.11.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
mobile on CEE3222 kW465.98–663.18
7 ×
JUICE BOOSTER 2
22 kW – mobil, ohne Konnektivität
Juice Technology
Schweiz · 31.10.2026
Sitz Schweiz.
mobile on CEE3222 kW799–999
3 ×
NRGkick 32A
bis 22 kW | 32 A, 1/2/3-phasig; Aufsatz 32A fünfpolig bis 22 kW, 16A fünfpolig max. 11 kW, 16A dreipolig max. 3,7 kW
NRGkick
Österreich · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
mobile on CEE3222 kW666–945
4 ×
Heidelberg Energy Control Plus
Energy Control Plus | 11 kW — Intuitiv bedienbar und wartungsfrei
Amperfied (Heidelberg)
Deutschland · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 11 kW11 kWfrom 394
1 ×
Heidelberg Home Eco
Home Eco | 11 kW — Intuitiv bedienbar und wartungsfrei
Amperfied (Heidelberg)
Deutschland · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 11 kW11 kW413–562
3 ×
KeContact P40
bis 11 kW, Wandmontage
KEBA
Österreich · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 11 kW11 kW912–1’025
2 ×
Spelsberg Wallbox
Wallbox / Ladestation für Elektrofahrzeuge bis 11 kW — komplett in Deutschland entwickelt und hergestellt
Spelsberg
Deutschland · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 11 kW11 kWfrom 1’093.81
1 ×
ABL eM4
bis zu 22 kW
ABL (Wallbox Group)
Deutschland · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 22 kW22 kWfrom 1’499
1 ×
ABL Pulsar Max
Ladeleistung 11 kW / 22 kW
ABL (Wallbox Group)
Deutschland · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 22 kW22 kW645–1’064
2 ×
ABL Pulsar Pro
Pulsar Pro (2026) 22 kW
ABL (Wallbox Group)
Deutschland · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 22 kW22 kW985–1’032
2 ×
Easee Charge Core
Lade mit Sie mit bis zu 22 kW (32A) an einem Drehstromkreis und bis zu 7.4 kW (32A) an einem einphasigen Stromkreis.
Easee
Norwegen · 31.10.2026
Im Schweizer Handel gelistet (schnellladen.ch, Stand 01.11.2026). Der Hersteller nennt die Schweiz bei der Charge Core ausdruecklich; bei der Charge Max nicht, dort belegt die Schweizer Listung die Verfuegbarkeit.
fixed station, 22 kW22 kWfrom 949
1 ×
Easee Charge Max
Lade bis zu 22 kW (32A) in einem dreiphasigen Stromkreis und bis zu 7,4 kW (32A) in einem einphasigen Stromkreis.
Easee
Norwegen · 31.10.2026
Im Schweizer Handel gelistet (schnellladen.ch, Stand 01.11.2026). Der Hersteller nennt die Schweiz bei der Charge Core ausdruecklich; bei der Charge Max nicht, dort belegt die Schweizer Listung die Verfuegbarkeit.
fixed station, 22 kW22 kWfrom 949
1 ×
Easee Charge Pro
Die Easee Charge Pro ist die perfekte Lösung für große Standorte.
Easee
Norwegen · 31.10.2026
Im Schweizer Handel gelistet (schnellladen.ch, Stand 01.11.2026). Der Hersteller nennt die Schweiz bei der Charge Core ausdruecklich; bei der Charge Max nicht, dort belegt die Schweizer Listung die Verfuegbarkeit.
fixed station, 22 kW22 kWfrom 1’189
1 ×
Easee Charge Up
Lade mit bis zu 22 kW (32A) in einem Drehstromkreis und mit bis zu 7,4 kW (32A) an einem einphasigen Stromkreis
Easee
Norwegen · 31.10.2026
Im Schweizer Handel gelistet (schnellladen.ch, Stand 01.11.2026). Der Hersteller nennt die Schweiz bei der Charge Core ausdruecklich; bei der Charge Max nicht, dort belegt die Schweizer Listung die Verfuegbarkeit.
fixed station, 22 kW22 kW499–631
3 ×
go-e Charger PRO
Ladeleistung: von 1,4 kW bis 11/22 kW je nach Anzahl der Phasen (1-phasig, 3-phasig)
go-e
Österreich · 01.11.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 22 kW22 kWfrom 1’089
1 ×
JUICE CHARGER me 3 unlimited
11 oder 22 kW – smarte Wallbox mit Lastmanagement
Juice Technology
Schweiz · 31.10.2026
Sitz Schweiz.
fixed station, 22 kW22 kWfrom 1’499
2 ×
KeContact P40 Pro
bis 22 kW, Wandmontage
KEBA
Österreich · 31.10.2026
Im Schweizer Handel gelistet (Stand 31.10.2026).
fixed station, 22 kW22 kWfrom 1’123
1 ×
Zaptec Go
Ladeleistung 11/22kW … Anschlusstyp Fahrzeug Typ 2 Socket … Zugangsschutz Offen / RFID / App … Lastmanagement Ja (bis zu 3 Stationen)
Zaptec
Norwegen · 01.11.2026
Im Schweizer Handel gelistet (schnellladen.ch, Stand 01.11.2026). Die Angaben in dieser Zeile stammen aus dem Vertriebsnetz; die Herstellerseite antwortet unserem Abruf nicht.
fixed station, 22 kW22 kWfrom 899
1 ×
Zaptec Pro MID
bietet eine maximale Ladeleistung von bis zu 22 kW bei dreiphasigem Betrieb
Zaptec
Norwegen · 01.11.2026
Im Schweizer Handel gelistet (schnellladen.ch, Stand 01.11.2026). Die Angaben in dieser Zeile stammen aus dem Vertriebsnetz; die Herstellerseite antwortet unserem Abruf nicht.
fixed station, 22 kW22 kWfrom 1’449
1 ×

Two things stand out. Mobile units now reach 22 kW, so they are no longer a stopgap for the road. And at least one manufacturer ships at 11 kW and leaves the release to 22 kW to the installer — the power is therefore not settled when the unit arrives.

What actually limits the charging power

The current takes this path: grid → wallbox or mobile charger → the car’s onboard charger → battery. The wallbox supplies alternating current and releases it under control; the conversion happens in the car, in the onboard charger. In DC fast charging that conversion happens outside and the onboard charger is bypassed — so a DC figure in a brochure says nothing about charging at home.

Die Ladestation signalisiert über die Control-Pilot-Leitung einen Höchststrom je Phase. Das Fahrzeug nimmt höchstens diesen Strom auf; die Station erzwingt keine Ladeleistung. The limit therefore comes from the weakest link in the chain: «Das schwächste Glied in der Ladekette (Auto, Ladekabel und Wallbox) entscheidet über die maximale Ladeleistung.» In most cases that is the onboard charger. A car that charges single-phase, or at 11 kW, charges no faster on a 22 kW station. So anyone choosing between 11 and 22 kW reads the vehicle’s data sheet first, not the device’s advertising.

There is a lower limit too, and it decides whether charging on solar power works. Common units start at 6 amps. For the Easee Charge Up it reads: «1-phasig: 1,4 (6 A)–7,4 kW (32 A) · TN 3-phasig: 4,1 (6 A)–22 kW (32 A)» Single-phase that is about 1,4 kW, three-phase about 4,1 kW — with less surplus than that nothing charges at all, unless the station switches to one phase by itself.

That floor is not one manufacturer’s quirk. Amperfied advertises one version with «PV-Laden, wenn Solarertrag mind. 4,1 kW beträgt» and the next one with managing below it — the same figure, taken from the other end. So anyone planning to charge on solar power checks first at what surplus the unit starts at all.

What the grid operator requires

The power ceiling comes not from the unit but from the technical rules of the Association of Swiss Electricity Companies. Three points decide it, and all three are in its information sheet.

That 22 kW is technically possible does not mean it will be approved at your own building connection. That decision rests with the local grid operator, and it comes before the work starts. The installation itself is not the buyer’s job in any case: «Die Installation einer Wallbox ist die Aufgabe einer Fachperson.»

What that means in practice shows in one unit from the table. The Easee Charge Up charges single-phase at up to 7,4 kW — in Switzerland the single-phase ceiling is 3,7 kVA. So the unit cannot do here what it can do, and whoever reads the manufacturer’s figure for Switzerland reads a number the grid operator does not allow. Three-phase it holds.

This holds for the mobile device as much as for the fixed station: charging at home at 11 or 22 kW requires, as a minimum, an installation carried out by a qualified electrician. Where several parties charge on the same house connection, a permanently installed billing arrangement comes on top — either through the building’s distribution board or through a decentralised system with a card at the charge point.

Metering and billing: what applies in Switzerland

Anyone wanting to bill the charged electricity to an employer or to fellow tenants runs into a gap in the law. In the words of the Federal Institute of Metrology: «In vielen europäischen Ländern, ebenso in der Schweiz, sind Elektrizitätszähler, die Kunden und Kundinnen an öffentlichen Ladestationen für Elektrofahrzeuge verwenden, nicht den Prüfungen und dem Nachweis zur Messbeständigkeit unterstellt.»

That does not mean meters in charging stations measure wrongly. It means nobody has to prove their measuring stability. A change is under way but not in force: «Die Revision wurde bis zu einer Änderung der Messgeräterichtlinie (2014/32/EU, MID) sistiert. Diese wurde inzwischen beschlossen und im März 2026 im Amtsblatt der EU publiziert (Richtlinie (EU) 2026/706).» Aktuell analysiert das METAS die Auswirkungen auf das schweizerische Metrologierecht und informiert laufend über das Ergebnis der Analyse und das weitere Vorgehen. The act concerned is the Verordnung des EJPD über Messmittel für elektrische Energie und Leistung, EMmV, SR 941.251.

Two consequences for a purchase. An MID meter in the unit is not yet billing — that needs user assignment, data export and a body that bills. And an advertising word ending in «ready» is not a commitment: «PV-ready», «V2G-ready» or «prepared for bidirectional» say it might work later, not that it works today.

Who registers the charge point, and when?

The duty is set out in the VSE’s Swiss installation rules. A technical connection application is required expressly for «Für folgende Geräte und Anlagen ist dem VNB vor Eingabe der Installationsanzeige ein technisches Anschlussgesuch einzureichen: … e) Ladestationen von Elektrofahrzeugen». An installation notice likewise: «In folgenden Fällen ist dem VNB frühzeitig, d.h. vor Beginn der Arbeiten, eine Installationsanzeige einzureichen: a) Neuinstallationen und Installationserweiterungen gemäss NIV … f) Anschluss von Ladestationen für Elektrofahrzeuge g) Neuerstellung, Änderung oder Erweiterung von Hausleitungen, Steuerleitungen sowie von Messeinrichtungen»

Both are filed by the electrician, not by the owner: «… sind dem VNB frühzeitig, vor dem Beginn der Arbeiten, durch den Installateur mit einer Installationsanzeige zu melden.» The owner carries the duty that it happens — in the VSE information sheet: «HauseigentümerIn / KonsumentIn: Muss die Ladestation durch einen konzessionierten Elektroinstallateur einbauen und dem Verteilnetzbetreiber melden lassen.» And for the electrician: «ElektroinstallateurIn: … Reicht das technische Anschlussgesuch TAG und die Installationsanzeige beim Verteilnetzbetreiber ein.»

A bare socket falls under the rule too. The VSE writes: «Melden Sie die Installation jeder Ladestation (auch mittels Steckdose angeschlossene) bei Ihrem Verteilnetzbetreiber an oder vergewissern Sie sich, dass Ihr Elektroinstallateur die Anmeldung durchgeführt hat.» If only the socket goes in and the station follows later, the notice is still due — the new line is an extension of the installation. And the approval does not last: «Eine Installationsanzeige wie auch ein technisches Anschlussgesuch verlieren ihre Gültigkeit, wenn die gemeldete Installation nicht innerhalb eines Jahres seit der Genehmigung begonnen wird.»

What does a wallbox cost?

The devices on this page cost CHF 394 to 1’649.95, read on 01.11.2026 across 43 offers. Shipping is included, and for an offer from abroad the 8,1 per cent import tax; what the carrier charges for clearing customs is not, as we have no Swiss figure for it. The width of that range is not down to the models: for the ABL Pulsar Max, 2 outlets quote amounts 65 per cent apart — for the same device.

The electrician’s work is a separate calculation, and it depends on what is already there. 91 quotes start at CHF 695 when the charging point sits near the fuse box, at CHF 1’100 in the middle case and at CHF 1’800 when the cable has to run some 15 metres through an underground garage. As at 27.09.2026. These are from-figures, not a range with a ceiling.

It goes down if something is already in place. Having an ordinary socket fitted costs, across 47 quotes, CHF 177.50 to 625, and the hourly rate runs from CHF 70 to 90. A three-phase CEE16 socket we place between CHF 300 and 690 — those two figures are our own placement, not a survey, because the source does not assess CEE sockets separately. If no line reaches the parking space at all, it will exceed every figure on this page, and only an on-site quote will say by how much.

Checking a quote

Device and labour together come to CHF 1’089 to 3’449.95 on the figures above — from the cheapest device with the simplest installation to the dearest with the heaviest. A quote above that is not thereby disproved. But it should be able to say what is the device, what is the labour, and what about your situation drives the effort.

Load management is often part of the package, and often something else is meant. A charging current set by hand is not load management. Dynamic means the device measures household consumption and adjusts the release continuously. A single-family house with two vehicles does not need it. Our reading: it earns its place in the underground garage of an apartment block, say at ten connection points and more than five households. Ask for your building’s connection rating and what falls away without this function. The installation rules require it where several stations hang on the same connection point: «Installation mit mehreren Ladestationen am gleichen Anschlusspunkt benötigen ein Lademanagement nach den Vorgaben des VNB.»

The same goes for anything that assumes a solar installation or a home battery. With no storage in the cellar you are paying for control with nothing to control. If the quote carries such a function, ask what it costs and what is left without it.

What the price is made of

A device price on its own compares nothing. What compares is the sum of seven items, and that can be two separate invoices: one from the electrician, one for the hardware.

What the electrician bills

What the hardware costs

What keeps running afterwards

Good technical preparation and planning ahead as far as the outlet keep the cost down. The hardware itself starts at CHF 394; upwards there is no limit. A cheap unit with a cable, a meter and a subscription bought on top can end up above a more complete offer.

Before ordering: twelve points

This list is our own editorial work; it appears in no source in this form. It does not ask which unit is best, but what gets expensive after the purchase if it was not settled before.

  1. Use and power settled
    Mobile or fixed? And what power does the car’s onboard charger accept — not what it manages at a fast charger.
  2. Connection and protection confirmed
    The electrician checks the unit, the circuit, residual-current protection, the conductors, the registration and the controllability. No choice made from advertising copy.
  3. Cable, length and parking position fit
    A Type 2 socket needs its own cable. With a fixed cable, hold its length against the parking position; with a mobile unit, count the plug attachments in.
  4. Load management settled
    A current set by hand is not load management. Dynamic means the building’s consumption is measured and the release adjusted.
  5. Solar charging checked as a whole system
    Wallbox, energy manager and metering have to match. Have the automatic switch between one and three phases confirmed, along with compatibility with the car.
  6. Authorisation and access protection fit
    Is the space open to others? Then settle how charging is released, for how many people, and what the cards cost.
  7. Metering and billing settled
    A display, or a billable measurement? Settle the exact version, the data export and the requirements of whoever bills.
  8. Operation without internet checked
    Does the unit charge and authorise without internet? Check local operation and the interfaces, not just the app.
  9. Network and recurring fees settled
    Test the wifi at the parking space, look at LAN as an alternative. Ask about the mobile subscription, its term and backend costs.
  10. Charging target set in the vehicle
    A percentage charging target is set in the vehicle, not at the wallbox — no station of the same brand is needed for it. What suits the battery is in the vehicle handbook.
  11. Service, spare parts and warranty checked
    Who repairs it, where do spare parts come from, how long is the software maintained, and is there service in Switzerland?
  12. Total price compared, not the device price
    Add up the seven items above, with the article number and the date of the offer.

What is not here

4 points are unverified and therefore carry no figure:

Whoever is missing may get in touch and we will add them: call@wattradar.ch.

Sources

Grid connection rules: VSE, Infoblatt Elektromobilität. Installation, charging chain and CEE plug: TCS, Ratgeber Elektroauto-Ladestation zu Hause installieren. The manufacturers are linked individually in the table. All read on 01.11.2026, by hand and not by script.

Data card: five wallbox types, from the household socket at 2.3 kW to the mobile station at 22 kW, as of 01.11.2026